We at ONP have a detailed process and execution involved in solar electrification projects. We like to call it EPCM “Engineering, Procurement, and Construction Management” rather than EPC “Engineering Procurement & Construction” because EPC alone was not helping our clients to succeed in their investments. In EPCM process, we undertake a detailed feasibility study, from coordinating equipment and materials to getting to a site, from exploration to operation. We offer EPC for projects ranging from 10KW to multiple mega watts. The difference between EPC and EPCM is best explained through our past projects and from our satisfied clients.
EPCM Advantages:
- Lower Overall Cost.
- Staff’s Sense of Ownership.
- More Control over Process.
- Better for less defined projects with anticipated changes to scope of supply.
- Less Legal Litigation (Identify issues early and remedy situation before larger problems arise).
- Owner’s Financing Flexibility.
- Project scheduler & Online project management.
- Manage the complete project for next 5 to 25 years.
With vertically integrated capabilities improving every aspect of the solar value chain, ONP optimizes the entire power plant process to maximize value and mitigate risk for customers.
ONP offers solar power project developers and investors, a complete turnkey Engineer, Procure, Construct (EPC) solution, thereby completely de-risking the technical design, delivery and operation aspects of a solar power project.
ONP delivers a technical solution that result in lower commercial risk for both equity partners and debt providers. Not only do ONP bring a proven design and construction capability to a project, it also offers certainty of the systems performance, thanks to our ongoing Operation & Maintenance offering.
Construction – ONP GUARANTEES | ||
---|---|---|
Construction Phase | PENALTY PAYMENT |
|
After 1 Years Operation | PERFORMANCE GUARANTEE |
|
Operation Phase | MODULE GUARANTEE | A 5-year product guarantee and a power guarantee structured as follows:
|
“WORKS” GUARANTEE (ELECTRICAL MATERIAL) | The owner will directly benefit from all legal and conventional guarantees given by subcontractors on all solar park equipment that falls into the definition of “works”. |
System | Areas (Acres) | Units Generated | Carbon Credits (approx) | REC (Approx) |
---|---|---|---|---|
1MW | 5 | 13.5 to 15 Lac | 1450 | 1400 |
2 MW | 5 | 27 to 30 Lac | 2900 | 2900 |
5 MW | 25 | 67.5 to 75 Lac | 7250 | 7100 |
7 MW | 35 | 94.5 to 75Lac | 10150 | 10,000 |
10 MW | 50 | 135 to 150 Lac | 14500 | 14,000 |
15 MW | 75 | 202.5 to 225 Lac | 21750 | 21,000 |
Design & Consultation
ONP creates a unique design & consulting plan for your project that solves key technical challenges including PV layout, Inverter design, cabling layout, protection & monitoring, quality of Service and capacity planning. In addition, we offer onsite visit and take necessary safety precautions for the plant life for next 25 to 30 years. Our services also include project viability based on ROI and maintenance across time.
- Greater business agility achieved by accelerating your deployment process.
- The knowledge transference needed to run and manage the solution after the engagement.